• About
  • Safety
  • Quality
  • Our Work
  • Locations
  • Careers
  • Contact
  • Apply Today
  • COVID-19
Header2.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Sitemap

Home    »    Info    »    Sitemap

Info

  • Sitemap
  • Privacy Statement
  • Terms & Conditions
  • Accessibility
Want an inside view of MEC?

Click here to read about our company and our capabilities.

InsideMEC.png

  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
      • VTA BART SILICON VALLEY PHASE II PROGRAM
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
      • Power & Energy
        • Haynes 5 & 6 Repowering Project
        • Goethals 345kV Substation
        • Watson Generating Station
        • Homer City Units 1 & 2 AQCS Project
        • Iatan Coal-Fired Power Plant
      • Water-related Infrastructure
        • El Pico Surface Water Treatment Plant
        • Bakersfield WWTP#3
        • Harry Tracy WTP Long-Term Improvements Project
        • Sugar Land Surface Water Treatment Plant
      • Renewable Energy
        • West Greenwich 2.1MW Solar Project
        • Northbridge 2.6MW Solar Project
        • North Brookfield 2.5MW Solar Project
        • Palmer 1.2MW Solar Project
        • Shrewsbury Solar Farm
        • Groveland 3.6MW Solar Farm
        • Milton Academy 192.27 kWP Roof-Mounted Solar Array
        • Waltham High School Roof-Mounted PV System
        • Mass Maritime Academy Wind Turbine Installation
        • IBEW Local 103 Wind Turbine Installation
        • Sun Edison Solar Panel Installation
        • St. Joseph's Abbey 20.3MW Solar Project
      • Commercial / Federal
        • Central Artery / Tunnel Electrical Finishes
        • 34.5kV XLPE Underground Cable Replacement
        • Genzyme Allston Expansion Project
        • Boeing Delta IV Rocket Manufacturing Facility
        • Center for Life Science-Boston
      • Special Systems
        • Midtown Tunnel Project
        • Leonard P. Zakim / Bunker Hill Bridge
        • Farley Pavilion Electrical Room Upgrade
        • Central Artery/Tunnel Security Project
        • Foothills Extension Phase 2A Design-Build
        • OCSD Variable Frequency Drives Upgrades Project
        • Hellgate Line Catenary Modifications
    • Transportation
      • Transit & Rail
        • Ottawa Confederation Line Extension
        • DART Green Line (CMGC-1)
        • Tren Urbano-Rio Piedras Rapid Transit System
        • Hellgate Line Catenary Modifications
        • T-REX (Transportation Expansion Project) Light Rail
        • TRAX Light Rail System
        • CATS South Corridor LRT Electrification System
        • Ybor Historic Trolley
        • Portland I-205 Extension
        • Northeast Corridor
        • Central Phoenix/East Valley Light Rail Transit Project
        • TRAX Airport Extension
        • Expo Line Culver City LRT Phase I
        • Phoenix Central Mesa Extension
        • Orange Line Phase I – MIC to Earlington Heights Connector
        • Metrolink Communication & Signal Maintenance Services
        • Foothills Extension Phase 2A Design-Build
        • Houston LRT Phase II
        • Northwest Rail Operating Facility (NWROF) Bid-Build
        • SCRRA Metrolink Communication & Signals Installation
        • RTD, Union Station
        • UTA Draper Extension
        • Metrolink Positive Train Control
        • Expo Line Culver City to Santa Monica LRT Phase II
      • Highway & ITS
        • Intercounty Connector Contract B
        • WMATA Replacement of Traction Power Equipment
        • Central Artery/Tunnel Electrical Finishes
        • Delaware River Bridge Security System
        • Leonard P. Zakim / Bunker Hill Bridge
        • Central Artery/Tunnel Security Project
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu