CATS SOUTH CORRIDOR LRT ELECTRIFICATION SYSTEM
Charlotte, North Carolina
As part of its contract with Hillsborough Area Regional Transit Authority (HART), Mass. Electric Construction Co. performed the installation of the overhead contact system for the entire 2.3-mile line for TECO Line Streetcar System, as well as the storage and maintenance facility. MEC installed a traction power substation in the maintenance facility.