METRO GOLD LINE FOOTHILL EXTENSION PHASE 2B
Montclair, California
Mass. Electric Construction Co. managed the entire rail systems scope for the 12.3-mi. light rail extension from Glendora to Montclair, including installation, testing and commissioning of TPSS, train control, communications, wayside and station electrical, ductbank, backbone fiber optic cable and contact wire installation.